Custom Search
 
  
 


TM 9-2330-329-14&P
VAPOR INTEGRITY TEST--Continued
0152 00
7.
If tank is overpressurized, close control shutoff valve (13) and open draincock valve (20) to
reduce tank pressure. When tank pressure has dropped to 6.0 in. 0.5 in. wc, close draincock
valve (23).
8.
Wait an additional 5 minutes, then record the time and final vacuum from gage (35).
9.
If vacuum does not drop on gage (35), tank is leak free. If pressure drops more than 0.5 in. wc,
reevacuate tank and piping system according to steps 3 thru 5 then continue with step 8.
0152 00-15



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business