Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
D VALVE AND LINES REPLACEMENT--Continued
0151 00
INSTALLATION
1.
Install fitting (13).
2.
Install elbow fitting (10) to high level shutoff (11).
3.
Install two hose nuts (12) to high level shutoff (11) and to D valve fitting (13).
4.
Install fitting (9) and pipe fitting (8).
NOTE
Install new cable ties as necessary.
5.
Install two fittings (6), fitting nuts (5), and D valve body (7).
6.
Install nut (1) and knob (4) to D valve stem (2) and tighten set screw (3).
FOLLOW-ON TASKS
1.
Reconnect negative battery terminal (WP 0007 00).
2.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0151 00-3/4 blank
|
||