Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
FILL GAGE STORAGE TUBE CAP REPLACEMENT--Continued
0130 00
INSTALLATION
1.
Install endcap (2), bolt (3), two washers (4), and new self-locking nut (5) to storage tube (6).
2.
Install pin (1) to endcap (2) and storage tube (6).
FOLLOW-ON TASK
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0130 00-2
|
||