Custom Search
 
  
 


TM 9-2330-329-14&P
CONTROL CABLE REPLACEMENT--Continued
0127 00
2.
Install two cables (2), U-bolts (4), and four nuts (3) to handles (1).
3.
Install cable (2) to U-bolt (8), fuse plate and reinforcing plate (6) and two nuts (7) to lever (5).
FOLLOW-ON TASKS
1.
Install cables to valve A control handle (WP 0126 00).
2.
Disconnect semitrailer grounding cables (WP 0007 00)
END OF TASK
0127 00-3/4 blank



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business