Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
PIPING MANIFOLD REMOVAL
1.
Remove 16 screws (3), self-locking nuts (1), washers (2), and two gaskets (5), from piping manifold
(8). Discard self-locking nuts and gaskets.
2.
Remove piping clamp and piping manifold (8).
PIPING MANIFOLD INSTALLATION
1.
Install piping manifold (8) and piping clamp.
2.
Install two new gaskets (5), 16 screws (3), washers (2), and new self-locking nuts (1), to piping
manifold (8).
HANDWHEEL REMOVAL
1.
Loosen nut (15) and turn handwheel (16) counterclockwise.
2.
Remove nut (15) and handwheel (16) from F valve (14).
HANDWHEEL INSTALLATION
Install handwheel (16) and nut (15) on F valve (14). Turn handwheel (16) clockwise and tighten nut (15).
FOLLOW-ON TASK
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0121 00-3/4 blank
|
||