Custom Search
 
  
 


TM 9-2330-329-14&P
VAPOR RECOVERY SYSTEM REPLACEMENT--Continued
0116 00
INSTALLATION
1.
Install pipe (18), U-bolt (17), two washers (16), and new self-locking nuts (15) to semitrailer.
2.
Install two split pipe couplings (22), new seals (21), four bolts (20), and nuts (19) to pipe (18).
3.
Install pipe (27), three U-bolts (26), six washers (25), and new self-locking nuts (24) to three
brackets (23).
0116 00-3



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business