Custom Search
 
  
 


TM 9-2330-329-14&P
ENGINE CONTROL PANEL MAINTENANCE--Continued
0114 00
3.
Install control panel (2), four bolts (65), eight washers (64), and four new self-locking nuts (63) to
semitrailer.
4.
Apply new silicone bead (61) to back surface of cutout (62) at the control panel rear (2).
5.
Install two gages (57), four brackets (60), and new teflon nuts (59) to control panel (2).
6.
Install hose fittings (58) to three gages (57).
0114 00-9



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business