Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
OVERFLOW PROTECTION SENSOR REPLACEMENT--Continued
0047 00
2.
Install sensor (4) into well (5) to height "A" recorded at removal.
3.
Tighten set screw (6).
4.
Install cap (3), two new lockwashers (2), and screws (1).
FOLLOW-ON TASKS
1.
Reconnect negative battery terminal (WP 0007 00).
2.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0047 00-3/4 blank
|
||