Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
OPERATOR/CREW PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)--Continued
0033 00
Table 1. Operator/Crew PMCS--Continued.
ITEM NO.
INTERVAL
ITEM TO BE
PROCEDURE
NOT FULLY
INSPECTED
MISSION
CAPABLE IF:
16--Continued
Before
Brake System
b.
With prime mover coupled Any leaks are
to semitrailer, apply prime present.
mover brakes and inspect
semitrailer service and
emergency air brake
couplings and all air lines
and fittings for leaks. If
leaks are found, notify
Organizational
maintenance.
c.
Push in brake interlock
No slack adjuster
valve and observe slack
movement.
adjusters for proper
operation (refer to
17
During
Brake System
Apply semitrailer brakes and
Brakes do not stop
observe operation.
semitrailer, or
semitrailer pulls to
one side.
18
During
Piping System
a.
Check all valves and
Any fuel leaks are
couplings for leaks.
present.
b.
Check valves P and R for
Any air leaks
proper operation.
present.
19
During
ABS Warning
If warning light stays on above 4
Light
mph (6 km/h), notify
Organizational maintenance
after completing mission.
20
During
Landing Gear
a.
With prime mover coupled Landing gear legs
to semitrailer, engage
cannot be raised or
landing gear handle and
lowered.
raise and lower landing
gear legs.
0033 00-8
|
||