Custom Search
 
  
 


TM 9-2330-329-14&P
OPERATION UNDER USUAL CONDITIONS--Continued
0007 00
10
Chock wheels of M967A2.
11.
Release M967A2 kingpin (2) from prime mover.
12.
Drive prime mover forward until M967A2 is resting entirely on its landing gear legs (10).
C.
CONNECTING GROUNDING CABLES
When performing maintenance on any of the M967A2 systems, the semitrailer should be secured to a
facility earth ground, or to the portable grounding rod supplied with the semitrailer.
NOTE
Specific grounding procedures can be found in FM 10-67-1.
1.
Connect grounding cable from loading rack or stand to any of three grounding studs (1) on
M967A2.
2.
Connect any of two M967A2 static reel cables (2) to a facility earth ground (metal rod or metal
fence pole).
3.
If no suitable ground exists at facility:
a.
Remove portable grounding rod (3) from M967A2.
b.
Insert portable grounding rod (3) in accordance with FM 10-67-1 into the ground a short
distance from M967A2.
c.
Connect closest static reel cable (2) to portable grounding rod (3).
0007 00-6



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business