TM 9-2330-326-14&P
b. Installation.
Install hubodometer (1) and new nut/lockwasher (2) to vehicular bracket (3).
c.
Follow -On Tasks.
1.
Connect semitrailer to prime mover.
2.
Remove chocks and tore.
3.
Raise landing legs.
4.
Remove ground boards and store.
5.
Road test to see if operational.
6-94