Custom Search
 
  
 


TM 9-2330-326-14&P
b. Installation.
1.
Install bulkhead assembly (2) using four bolts (14), four new lockwashers (13), and four nuts (12).
2.
Install crossmember bulkhead assembly (3) using eight bolts (4), eight new lockwashers (5),
and eight nuts (12).
3.
Install roadside and curbside stowage assemblies (7) using four bolts (8), four washers (9), four
new locknuts (10), two bolts (1), and two new locknuts (11).
c.
Follow -On Tasks.
1.
Insure all hardware is fastened securely.
2.
Reinstall sideboards/stakes into stowage rack, strap, and secure in bulkhead stowage area.
3.
Connect semitrailer to prime mover.
4.
Remove tire chocks and ground boards.
5.
Raise landing legs.
6-72



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business