Tweet |
Custom Search
|
|
|
||
TM 9-2330-326-14&P
b. Installation (Cont.).
5.
Install three pipe bushings (7), hose assemblies (1), and elbows (2).
6.
Install pipe tee ( ), adapter ( ), tube ( ), and elbow ( ) to air brake chamber. Do not twist
9
1
8
3
hoses.
7.
Install two elbows (3) onto ECU valve and two tubes (2).
8.
Install two elbows (4), pipe couplings (5), hose assemblies (6), and elbows (7) to two
tubes (8).
9.
Install pipe tee (9), adapter (1), hose (8), and elbow (3) to air brake chambers.
10. Install hose assembly (6), pipe coupling (5), and elbow (4) to tube (8).
11. Install adapter (1) to front air reservoir.
12. Install two elbows (3) to front and rear air reservoirs and install tube (2).
13. Install pipe tee (1) to ECU valve and elbow (3) to front air reservoir and install tube (15).
14. Install adapter (22) to air reservoir.
15. Install two adapters (1) to two gladhands and install tubes (2 & 8).
16. Install hose clamps (14) and hose clips (13) as necessary.
c.
Follow -On Tasks.
NOTE
To access gladhand hoses and fitting upper deck boards (See
not have to be removed to replace gladhands.
1.
Connect semitrailer to prime mover.
2.
Raise landing legs.
3.
Remove/store chocks and ground boards.
4.
Pressurize system and check for leaks.
5.
Road test system to insure proper operation.
6-43
|
||