Custom Search
 
  
 


TM 9-2330-326-14&P
c.
Dust Shield Removal and Installation. (Cont.)
5.
Install the two nuts onto the filler plate studs to secure the filler plate to the C-section of the
dustcover. Then, reposition the brake drum tight against the hub flange and check for any
dustcover interferences. If there are any light interference conditions, the dust cover can be
slightly displaced by using a small pry bar between the drum and dustcover in the area where
they are rubbing.
a. Follow -On Tasks.
1.
Install brake drum (para. 6-9).
2.
Install tire and wheel (para. 6-18).
3.
Remove jack stands.
4.
Connect semitrailer to prime mover.
5.
Raise landing legs.
6.
Remove/store chocks and ground boards..
7.
Road test to check for proper/safe operation.
6-28



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business