Tweet |
Custom Search
|
|
|
||
TM 9-2330-326-14&P
Table 3-1. Operator/Crew PMCS (Cont.)
ITEM
ITEM TO
EQUIPMENT NOT
PROCEDURE
NO.
INTERVAL
CHECK/SERVICE
READY/AVAILABLE IF:
25
After
Air Reservoir Tanks
Pull reservoir drain cables to remove all
System is not drained of
moisture.
26
After
Bolster Plate Drain
Check to make sure bolster plate drain holes
Bolster plate drain holes are
Hole
are not plugged with grease.
plugged.
27
After
Semitrailer
After operation, especially in mud, salt
Not accomplished when
Cleanliness
environment, or fording conditions, flush out
mission permits or mission
axles, axle ends, suspension, landing gear,
completed.
underside/topside of semitrailer and stowage
box with clean, low-pressure water:
a. Clean and lubricate all parts as
specified in the Appendix C to make
sure water/debris is flushed out of
system.
b. Check all electrical connections for
corrosion and security.
c. Make sure all painted surfaces are
touched up where necessary to prevent
rust.
NOTE
Mission requirements, urgency,
safety, and common sense should
be considered in determining NMC
status of semitrailer.
28
Weekly
Wheels
Check all wheels for handhold cracks, cracks
Cracks or leakage is evident.
between and around stud holes, rust streaks
and grease stains . Notify Unit maintenance.
(See Appendix H-24.)
29
Monthly
Frame and Decking
Perform a visual inspection of semitrailer for
evidence of corrosion and condition of upper
and lower deck wood. Visually check all welds
for rust and cracks. Notify Unit maintenance if
corrosion or deck damage is evident.
3-12
|
||