Custom Search
 
  
 


TM 9-2330-326-14&P
Table 3-1. Operator/Crew PMCS (Cont.)
ITEM
ITEM TO CHECK/
EQUIPMENT NOT
INTERVAL
PROCEDURE
NO.
SERVICE
READY/AVAILABLE IF:
WARNING
Wear protective goggles if you are
under semitrailer and need to operate
drain valves. Avoid the air stream.
Failure to do so could result in persona l
injury.
15
Before
Air Reservoir
a.
Make sure drain valves do not leak air.
Drain valves leak air.
Tanks
b.
Inspect air tanks for damage, loose fittings,
Any air leaks are present
missing hardware, and any evidence of air
or hardware is missing.
leakage.
c.
Inspect drain valve pull cables for a frayed
or broken condition.
16
Before
Stowage Box
Open and close door, make sure hinge does  Hardware loose or
and Door
not bind, and all mounting/securing hardware is missing.
tight and present. Make sure drain holes are not
blocked. Insure jack is secure and door seal is
in  good  condition.  Keep  box  clean  and
serviceable.
CAUTION
Make sure there is no debris in ISO
container  lock  slots  that  would
prevent twistlock engagement and
positive locking
Check to make sure there is no debris
17
Before
Twist Locks
Twist locks are required
in  the  lock  pocket  that  would
for mission.
interfere with lock operation. Make
sure twist locks (all) operate freely
and do not bind.
3-9



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business