Custom Search
 
  
 


TM 9-2320-279-10-3
Operation Under Usual Conditions (Cont)
2-133. PUMP AND PLUMBING BLOW-OUT PROCEDURE (CONT).
7
996
6
5
h. Remove cap (5) from PASSENGER SIDE AUXILIARY INLET (6).
i. Remove blow-out adapter (7) from stowage and install on PASSENGER
SIDE AUXILIARY INLET (6).
707p
9
8
j.  Make sure PASSENGER SIDE AUXILIARY INLET valve control (8) is in
CLOSED position. Indicator light (9) will come on.
k. Make sure all valves are closed.
2-206



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business