Custom Search
 
  
 


TM 9-2320-279-10-3
Operation Under Usual Conditions (Cont)
2-131. PREPARATION FOR STORAGE OR SHIPMENT (CONT).
613p
20
51
51
21
(38) Put NO. 1 (20) and NO. 2 (21) DRIVER SIDE DISCHARGE valve
controls in CLOSED position. Two indicator lights (51) should
come on.
tfft0612p
16
14
54
18
52
53
(39) Put PASSENGER SIDE AUXILIARY INLET valve control (18) in
CLOSED position. Indicator light (52) will come on.
(40) Put DRIVER MAIN INLET valve control (16) in CLOSED position.
Indicator light (53) will come on.
(41) Put TANK FILL and RE-CIRCULATING LINE valve control (14) in
CLOSED position. Indicator light (54) will come on.
2-200



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business