Custom Search
 
  
 


TM 9-2320-279-10-3
Operation Under Usual Conditions (Cont)
2-124. FOAM SYSTEM OPERATING PROCEDURES (PUMP OPERATOR'S
PANEL) (CONT).
b. Starting Foam Solution Flow.
01235p
3
2
6
1
4
5
(1)
Start water pump engine (para 2-113).
(2)
Make sure TANK FILL and RE-CIRCULATION LINE valve (1)
is closed.
(3)
Put FOAM SYSTEM switch (2) in ON position. Indicator light (3) will
come on.
(4)
Put FOAM TANK selector switch (4) to desired foam agent. Indicator
light A (5) or light B (6) will come on.
(5)
Make sure correct FOAM TANK selector indicator light A (5) or B (6) is
illuminated.
2-158



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business