Tweet |
Custom Search
|
|
|
||
TM 9-2320-279-10-3
Preventive Maintenance Checks and Services (PMCS) (Cont)
2-97. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) TABLE
(CONT).
Table 2-9. Operator/Crew Preventive Maintenance Checks and Service (PMCS) (Cont)
NOTE: These checks are to be made in the order listed, within designated interval.
A-After Operation D-During Operation W-Weekly
M-Monthly
INTERVAL
ITEM TO BE INSPECTED PROCEDURE:
Item
Check for and have repaired, filled, or adjusted
NOT MISSION
No. A D W M
as needed.
CAPABLE IF:
PUMP OPERATORS PANEL.
12.
Lights
a. Start water pump engine (para 2-113).
b. Set pump operators panel light switch to ON
position.
WARNING
Pump operators panel lights become hot
after being on for an extended period of
time. Use extreme care when operating
pump operators panel not to contact pump
panel light. Failure to comply may result
in burns to personnel.
c. Check that side lights illuminate.
PUMP OPERATORS PANEL
tfft00119p
Inspect pump operators panel switches for proper
operation and visible damage.
Inspect pump operators panel pressure governor for
proper operation and visible damage.
Inspect gages for visible damage. Check that all
Any gage is
segments of water tank and foam tank level gages
damaged or
illuminate when tanks are full.
inoperable.
2-56
|
||