TM 10-6640-239-13
4-149
4-65. OXYGEN AND NITROGEN GAS SUPPLY LINES.
This task consists of:
a.
Remove
b.
Install
INITIAL SET-UP
Tools Required
General Mechanics Tool Kit, (Appendix B, Section III, Item 1)
Materials/Parts Required
Teflon Tape, (Appendix E, Section II, Item 139)
WARNING
Pressure systems safety precautions apply to all ranges of pressure. Care must
be take during testing to ensure that all test connections are properly and tightly
made prior to applying pressure to the test setup. Ensure gas cylinder valves are
tightly closed prior to removing/replacing gas cylinders.
REMOVE
1.
Remove Oxygen and Nitrogen Supply Hoses. See figure 4-59.
a.
Open gas cylinder cabinet door.
b.
Close gas cylinder discharge valves (1).
c.
Open valve (12) to bleed lines.
d.
Disconnect oxygen and nitrogen supply hoses (2) from gas cylinder discharge valves (1).
e.
Disconnect oxygen and nitrogen supply hoses (2) from pipes (3).
2.
Remove Oxygen and Nitrogen Supply Piping.
a.
Remove sections of system piping (4) by locating nearest pipe union (5), elbow (6), adapter (7), or tee (8).
b.
Disconnect pipe union (5), elbow(s) (6), adapter (7), and/or tee (8).
c.
Remove screws (9), washers (10), and clamps (11) as applicable and remove system piping (4).
3.
Remove Oxygen and Nitrogen Supply Valves.
a.
Disconnect valve (12) from pipe nipple (13).
INSTALL
1.
Install Oxygen and Nitrogen Supply Valves. See Figure 4-59.
a.
Apply teflon tape on male fittings. Be sure to wrap teflon tape in same direction of pipe thread.
b.
Install valve (12) by screwing valves onto pipe nipple (13).
2.
Install Oxygen and Nitrogen Supply Piping.
a.
Apply teflon tape on male fittings. Be sure to wrap teflon tape in same direction of pipe thread.
b.
Install system piping (4) and secure with screws (8), washers (9), and clamps (10) as applicable.
c.
Connect system piping (4) to pipe union (5), elbow(s) (6), adapter (7), and/or tee (8).
|
|