Custom Search
 
  
 


TM 10-6640-239-13 1-1 CHAPTER 1 INTRODUCTION Section I.  GENERAL INFORMATION Alphabetical Index Paragraph Title Paragraph Destruction of Army Material to Prevent Enemy Use ...................................................................................... 1-3 Maintenance Forms, Records and Reports........................................................................................................ 1-2 Nomenclature Cross-Reference List ................................................................................................................. 1-8 Preparation for Storage or Shipment................................................................................................................. 1-4 Quality Assurance/Quality Control (QA/QC)................................................................................................... 1-5 Reporting Equipment Improvement Recommendations (EIRs) ....................................................................... 1-6 Safety, Care and Handling ................................................................................................................................ 1-7 Scope ................................................................................................................................................................ 1-1 1-1. SCOPE. a. Type of Manual.  This manual contains operation and maintenance instructions for the Operator, Unit and Direct Support maintenance personnel of the Semi-Trailer Mounted Supplemental Petroleum Laboratory (Refer to Figure 1-1). b. Equipment Name.  Supplemental Petroleum Laboratory, Semi-Trailer Mounted (NSN 6640-01-485-5439). c. Purpose of Equipment.  The Supplemental Petroleum Laboratory is to be used by Army personnel to augment the Semi-Trailer Petroleum Laboratory, in testing of petroleum and petroleum products during tactical military operations. 1-2. MAINTENANCE FORMS, RECORDS, AND REPORTS. Department of the Army forms and procedures used for equipment maintenance will be those prescribed by DA Pam 738- 750, The Army Maintenance Management System (TAMMS). 1-3. DESTRUCTION OF ARMY MATERIAL TO PREVENT ENEMY USE. Command decisions, according to tactical situation, will determine when destruction of the Supplemental Petroleum Laboratory will be accomplished.  A destruction plan will be prepared by the using organization, unless one has been prepared by higher authority.  For general destruction procedures for this equipment, refer to TM 750-244-3, Procedures For Destruction of Equipment to Prevent Enemy Use. 1-4. PREPARATION FOR STORAGE OR SHIPMENT. Refer to Section IV of Chapter 3. 1-5. QUALITY ASSURANCE/QUALITY CONTROL (QA/QC). The quality of the Supplemental Petroleum Laboratory must at all times be in accordance with the requirements set forth in MIL-L-53111(ME), paragraph 4.  If a discrepancy is found to exist between your laboratory and MIL-L-53111(ME), notify your supervisor.  When reporting a Quality Deficiency, use Standard Form 368, Product Quality Deficiency Report. The form should be submitted to: Commander, U.S. Army Tank-automotive & Armaments Command, ATTN: AMSTA-TR- D/210, 6501 E. 11 Mile Road, Warren, MI 48397-5000. For electronic methods use DODAC: W56HZV.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business