Custom Search
 
  
 


TM 10-6640-239-13 4-26 4-13.    GAS CYLINDER AND PROPANE STORAGE LOCKER VENTS. This task consists of: a. Remove b. Install INITIAL SET-UP Tools Required Portable Electric Drill, (Appendix B, Section III, Item 2) Twist Drill Set, (Appendix B, Section III, Item 2) Hand Blind Riveter, (Appendix B, Section III, Item 3) Materials/Parts Required Rivets, (8) REMOVE Remove Storage Locker Vents.  See Figure 4-3. a. Remove eight rivets (1) and storage locker vents (2) from Mod Lab B. INSTALL Install Storage Locker Vents.  See Figure 4-3. a. Install storage locker vents (2) into openings of Mod Lab B and secure with eight rivets (1). Figure 4-3.  Gas Cylinder and Propane Storage Locker Vents


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business