TM 10-6640-238-13
B-9
SECTION II. MAINTENANCE ALLOCATION CHART FOR
MODULAR BASE LAB Continued
(4)
Maintenance Level
Unit
Direct
Support
General
Support
Depot
(1)
Group
Number
(2)
Component
Assembly
(3)
Maintenance
Function
C
O
F
H
D
(5)
Tools and
Equipment
Ref Code
(6)
Remarks
Code
32
Reid Vapor
Pressure (RVP)
Bath
Inspect
Remove/Install
.1
.2
1
A
33
Copper Strip
Corrosion Bath and
Brackets
Inspect
Remove/Install
.1
.2
1, 2, 3
A
33
Cloud and Pour Point
Tester and Brackets
Inspect
Remove/Install
.1
.2
1, 2, 3
A
34
Kinematic Viscosity
Bath
Inspect
Remove/Install
.1
.1
1
A
35
Centrifuge
Inspect
Remove/Install
.1
.2
1
A
36
Grease Working
Machine
Inspect
Remove/Install
.1
.2
1
A
37
Distillation Test
Apparatus
Inspect
Remove/Install
.1
.3
1, 2
A
38
Oxidation Stability
Bath
Inspect
Remove/Install
.1
.2
1
A
39
Oxygen and Nitrogen
Gas Supply Lines
Inspect
Remove/Install
.1
.7
1
39
Gas Cylinder and Gas
Regulator Valve
Inspect
Remove/Install
.1
.3
1
40
Pressure
Recording Gauge
Inspect
Remove/Install
Calibrate
.1
.4
.5
1
A
41
Laboratory Oven
Inspect
Remove/Install
Calibrate
.1
.2
1.0
1, 2
A
42
Burnout Furnace
Inspect
Remove/Install
.1
.2
1, 2
A
43
Explosion Proof
Refrigerator
Inspect
Remove/Install
.1
.6
1
A
44
Jet Fuel Thermal
Oxidation Tester
Inspect
Remove/Install
Calibrate
.1
.3
1.0
1
A
46
Water Bath and Hot
Plate
Inspect
Remove/Install
.1
.8
1, 2, 3
A
49
Flowmeter Kit and
Brackets
Inspect
Remove/Install
.1
.2
1, 2, 3
51
Gum Bath/Fume Hood
Exhaust Blower Hoses
Inspect
Remove/Install
.1
.1
1
|
|