Custom Search
 
  
 


TM 10-6640-238-13 5-46 d. Secure motor bracket (10) to equipment shelf (11) with four nuts (6), eight washers (7), four dampers (8), and screws (9). e. Install discharge duct (4) and secure by tightening clamp (3). f. Connect wiring and conduit (2) to junction box (1).  Remove tags. g. Install access panel on blower motor junction box (1). h. At Power Panel No. 2, set circuit breaker A15CB11 to ON.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business