TM 10-6640-238-13
5-42
5-20. AIR/STEAM FLOW RATE INDICATOR METERS.
This task consists of:
a. Remove
b. Install
INITIAL SET-UP
Tools Required
General Mechanics Tool Kit, (Appendix B, Section III, Item 1)
Materials/Parts Required
Teflon Tape, (Appendix E, Section II, Item 157)
Equipment Condition
Steam Boiler Shut Down and appropriate Circuit Breaker Switch OFF.
REMOVE
Remove Air/Steam Flow Rate Indicator Meters. See Figure 5-16.
a.
Disconnect union (1) from air flow rate indicator meter piping (2) and remove meter (3).
b.
Disconnect unions (4) from steam flow rate indicator meter piping (5) and remove meter (6).
c.
Remove piping (2 and 5) from meters (3 and 6).
INSTALL
Install Air/Steam Flow Rate Indicator Meters. See Figure 5-16.
a.
Apply teflon tape to male fittings. Be sure to wrap tape in same direction as pipe thread.
b.
Install piping (2 and 5) on meters (3 and 6).
c.
Position steam flow rate indicator meter (6) behind panel and connect union (4).
d.
Position air flow rate indicator meter (3) behind panel and connect union (1).
e.
Prepare and operate water system using internal water tank as source in accordance with procedures listed in
paragraph 2-6j.
f.
Inspect for leaks and check for proper operation.
|
|