TM 10-6640-238-13
4-26
3. Install Telephone Connector.
a.
Install telephone connector (30) into power panel (5) and secure with three screws (29), washers (28), lockwashers
(27), and nuts (26).
4. Install Ground Lug.
a.
Install ground lug (25) into power panel (5) and secure with washer (24), lockwasher (23) and nut (22).
5.
Install Auxiliary Power Receptacle.
a.
Install auxiliary power receptacle (21) into power panel (5) and secure with two screws (17), washers (18),
lockwashers (19), and nuts (20).
b.
Install plate (16) and secure with four screws (12), washers (13), lockwashers (14), and nuts (15).
6.
Install Input Power Connector/Receptacle.
a.
Install input power connector/receptacle (11) into power panel (5) and secure with four screws (10), washers (9),
lockwashers (8), and nuts (7).
7.
Install Power Panel and Gasket.
a.
Position power panel (5) in place for connecting electrical leads.
b.
Attach leads as tagged to proper connection points. Remove tags.
c.
Install power panel (5) into wall opening of Mod Lab A (6) and secure with 21 rivets (4).
d.
Install gasket (3) on power panel (5) and secure in place with adhesive.
8.
Install Door Assembly.
a.
Install door assembly (2) over power panel (5) and secure with eight rivets (1).
|
|