Figure 2-4
Grounding Rod Installation
2-l 1. Operating Procetlwes
a.
Filling the Tank Through Bottom Loading Valve Port.
( I)
Perform grounding procedures. Refer to paragraph 2-C).
WARNING
Fire hazards exist when handling fuel. Do not smoke
or use open flame within 50 feet of the tank dispensing unit.
(2)
Check the control lever (5, Figure 2-5) and be certain it is in the OPEN position.
Figure 2-5
Operating Control Lever
2-7
|
|