(36) Pull driver's side winch cable (35) to center rear of payload and route over both front tiedown chains (39).
(37) Pull PASSENGER SIDE WINCH lever (22) upward momentarily until there is enough slack in passenger
side winch cable (23) to be removed from stow hook (24).
(38) Move clevis on passenger side winch cable (23) off stow hook (24) to unstow winch cable (23).
(39) Continue paying out passenger side winch cable (23) until spotter on ground can reach clevis.
(40) Release PASSENGER SIDE WINCH lever (22).
(41) Disengage PASSENGER SIDE WINCH KICKOUT switch (20) by pulling on switch.
(42) Remove cotter pin (25) and shouldered pin (26) from clevis on passenger side winch cable (23).
(43) Perform procedure in paragraph 2-2b, step (8), and disconnect all tiedown chains (39) from front of
payload.
(44) Remove one towing shackle (48) and one payload tiedown shackle (41) from rear of platform and install to
pintle (49) on rear center of payload.
(45) Attach clevis on driver's side winch cable (35) to payload tiedown shackle (41) on pintle (49) at center rear
of payload.
(46) Secure driver's side winch cable (35) by installing shouldered pin (26) and cotter pin (25).
WARNING
Extend safety rails while attaching or removing payload winch cable or serious
injury to personnel may occur.
(47) Unlatch and extend both gooseneck safety rails (43).
(48) Route driver's side winch cable (35) through streetside gooseneck cable guide (33) and around pivot pin
sheave (50).
(49) Pull out passenger side winch cable (23) and attach clevis to payload upper left rear recovery eye (16).
(50) Secure passenger side winch cable (23) by installing shouldered pin (26) and cotter pin (25).