Custom Search
 
  
 


TB 9-2330-381-14-1
2-3.
DUAL WINC H LOADING AND UNLOADING DISABLED PAYLOAD WITH MINE CLEARING BLADE
ATTACHED (CONT)
(14) Ensure that DRIVERS SIDE WINCH KICKOUT switch (19) and PASSENGER SIDE WINCH KICKOUT
switch (20) are ENGAGED (pushed away from operator).
(15) Ensure that CABLE HOLD DOWN lever (21) is ON (pushed away from operator).
(16) Pull DRIVERS SIDE WINCH lever (34) upward momentarily until there is enough slack in driver's side
winch cable (35) to be removed from stow hook (24).
(17) Move clevis on driver's side winch cable (35) off stow hook (24) to unstow winch cable (35).
(18) Continue paying out driver's side winch cable (35) until spotter on ground can reach clevis; then release
DRIVERS SIDE WINCH lever (34).
(19) Remove and retain cotter pin (25) and shouldered pin (26) from clevis on driver's side winch cable (35).
(20) Remove cotter pin (27) and shouldered pin (28) from auxiliary winch cable clevis (29).
(21) Install auxiliary winch cable clevis (29) over one ear of clevis on driver's side winch cable (35) and install
shouldered pin (28) and cotter pin (27).
(22) Engage AUXILIARY WINCH KICKOUT by lifting and rotating AUXILIARY WINCH KICKOUT lever (10) CW.
Disengage DRIVERS SIDE WINCH KICKOUT switch (19) by pulling switch.
2-76



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business