Tweet |
Custom Search
|
|
|
||
TB 9-2330-381-14-1
2-3.
DUAL WINCH LOADING AND UNLOADING DISABLED PAYLOAD WITH MINE CLEARING BLADE
ATTACHED (CONT)
(32) Operate DRIVERS SIDE WINCH lever (34) and PASSENGER SIDE WINCH lever (22) until front tiedown
chains are tight and payload tracks (rear road-wheels) are firmly on front payload chocks (42).
(33) Place both free payload chocks (37 and 38) to front curbside and streetside tracks of payload.
WARNING
Prior to removing winch cable from payload, winch operator must be sure each
cable sags to top of tractor tires to relieve cable twist or serious injury to
personnel may occur.
(34) Operate DRIVERS SIDE WINCH lever (34) and PASSENGER SIDE WINCH levers (22) until each winch
cable sags to top of tractor tires.
WARNING
Extend safety rails while attaching or removing payload winch cable or serious
injury to personnel may occur.
(35) Unlatch and extend gooseneck safety rails (43).
(36) Check for twist on driver's side winch cable (35) and passenger side winch cable (23) before disconnecting
from upper right rear recovery eyes (15) and upper left rear recovery eye (16).
(37) Remove cotter pins (25) and shouldered pins (26) from devises on driver's sde winch cable (35) and
i
passenger side winch cable (23) and remove cables from upper right rear recovery eye (15) and upper left
rear recovery eye (16) on payload.
WARNING
Retract and latch gooseneck safety rails before operating tractor/ semitrailer or
serious injury to personnel and damage to equipment may occur.
(38) Retract and latch gooseneck safety rails (43).
(39) Perform procedures in paragraph 2-2a, steps (45) thru (52) (u), and secure payload to semitrailer platform.
(40) Install shoulde red pins (26) and cotter pins (25) into devises on driver's side winch cable (35) and
passenger side winch cable (23).
(41) Remove driver's side winch cable (35) and passenger side winch cable (23) from gooseneck cable guides
(33).
2-68
|
||