Tweet |
Custom Search
|
|
|
||
TB 9-2330-381-14-1
(19) Remove two outboard curb guides (15) and position in second pin holes between #3 and #4 bogies with pin
side facing outboard from center of platform.
(20) Move two inboard curb gui des (15) to second pin holes with pin side facing outboard from center of
platform.
(21) Perform procedures in paragraph 2-2a, steps (25) thru (30), and adjust platform height to platform
unloading position, lower ramps, and install two curb guides (15).
2-43
|
||