Custom Search
 
  
 


TB 9-2330-381-14-1
2-2. LOADING AND UNLOADING ABLE PAYLOAD WITH MINE CLEARING BLADE ATTACHED (CONT)
(7) Adjust ramp span width to match payload track width, as required, per TM 9-2330-381-14.
(8) Remove payload tiedowns and payload chock tiedowns from payload as follows:
(a) Open utility load binder (37) and remove two 11-foot (3.4m) utility chains (36) from over mine clearing
blade tines and from two cargo tiedown rings (38).
(b) Remove two utility chains (36) and utility load binder (37) from platform.
2-36



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business