(47) Place one timber (23) on each side of platform against curb guides (15) and under mine clearing blade
inboard of third tine from outboard edge of mine plow.
(48) Ensure that chain hooks are forward of timbers (23) and that cargo (not payload) tiedown ri ngs are not
covered by timbers (23).
(49) Payload operator lower mine clearing blade tines onto timbers (23).
(50) Shut down payload.
CAUTION
Adjustment bolts in the mine clearing blade mounting frame must be tight against
the front of the payload to ensure that the mine clearing blade is mounted firmly to
the payload. Otherwise, damage to equipment may occur.
(51) On both sides of payload, verify that mine clearing blade mounting frame adjustment bolts (30) are tight.