Custom Search
 
  
 


TB 9-2330-381-14-1
2-2.
LOADING AND UNLOADING ABLE PAYLOAD WITH MINE CLEARING BLADE ATTACHED (CONT)
(q) Select four 19-foot (5.8m) tiedown chains (24) and lay out as follows:
1. Connect two 19-foot (5.8m) chains (24) together with hook of one near oval end link of other to
make one long chain (24).
2. Position free oval end link over rear of platform near streetside rear tow lug.
3. Route long chain (24) forward through towing shackle (19) in curbside center tiedown ring.
Ensure that hook end of chain (24) goes over top of shackle and oval link end is under shackle
flat on platform.
4. Route long chain (24) across center of platform and back until free hook (25)is near streetside
rear tiedown ring. Ensure that all of chain (24) is positioned inboard of track curb guides (15)
positioned on platform.
5. Connect remaining two 19-foot (5.8m) chains (24) together with hook of one near oval end link of
other to make a second long chain (24).
6. Position free oval end link over rear of platform near curbside rear tow lug.
7. Route long chain (24) forward over top of chain (24) positioned in steps 1 thru 4 above and
through towing shackle (19) in streetside center tiedown ring. Ensure that hook end of chain (24)
goes over top of shackle and oval link end is under shackle, flat on platform.
8. Route long chain (24) across center of platform and back until free hook (25) is near curbside rear
tiedown ring.  Ensure that all of chain (24) is positioned inboard of track curb guides (15)
positioned on platform.
2-14



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business