TB 9-2330-381-14-1
2-2.
LOADING AND UNLOADING ABLE PAYLOAD WITH MINE CLEARING BLADE ATTACHED (CONT)
(e) Extend four load binders (17) to show approximately 6.5 inches (16.5 cm) of thread on both ends.
(f) Position two load binders (17) on ground near rear recovery eyes (18).
(g) Position other two load binders (17) on ground on each side of platform near #4 bogey position.
(h) Select two towing shackles (19) and four 25-ton (1-3/4-inch diameter) shackles (20).
(i) Install two towing shackles (19) in center tiedown rings in platform.
(j) Install two 25-ton shackles (20) in lifting eyes (21) at outside rear of semitrailer.
(k) Position remaining two 25-ton shackles (20) with load binders (17) at end of platform near rear
recovery eyes (18).
(l) Select four payload tiedown shackles (22).
(m) Position two payload tiedown shackles (22) at front of platform near oval end link of front tiedown
chains (16).
(n) Position remaining two payload tiedown shackles (22) on ground near load binders (17) at #4 bogey
positions.
(o) Locate two 4-inch x 4-inch x 4-foot (10.2 cm x 10.2 cm x 1.2m) (may be larger but not longer) timbers
(23) and position on ground near payload tiedown shackles (22) and load binders (17).
(p) Select two additional 11-foot (3.4m) tiedown chains (16) and position on ground alongside #4 and #5
bogey positions with oval end link near load binders (17) and hook end near rear lifting eyes (21). Do
not connect.