Custom Search
 
  
 


TB 9-2330-330-14&P-1
INITIAL INSTALLATION (continued)
55. Position front right door frame (44) on piping frame assembly (40) and front left door frame (42).
56. Align holes in front right door frame (44) with holes in front left door frame (42) and install with
eight flat washers (3), four capscrews (9), and four self-locking nuts (2). Do not fully
tighten hardware.
57. Push front right door frame (44) back and hold in place while capscrews (9) in slotted holes of
support plate (38) are tightened.
58. Tighten all support plate (38) hardware. Torque capscrews and self-locking nuts
to 55-65 lb-ft (75-88 Nm).
59. Tighten all front right door frame (44) and front left door frame (42) hardware. Torque
capscrews and self-locking nuts to 55-65 lb-ft (75-88 Nm).
4-22



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business