Tweet |
Custom Search
|
|
|
||
TB 9-2330-329-14&P-1
FOLLOW-ON TASK
1. Position spare tire support and roadside drain pipe (1) on the semitrailer. Install spare tire
support and roadside drain pipe (1) on bottom support bracket (3) with four new flat
washers (144), two capscrews (2), and two new self-locking nuts (146). Torque self-locking
nuts to 30-35 lb-ft (41-48 Nm).
2. Install spare tire support and roadside drain pipe (1) on left and right channels (5) four new flat
washers (144), two capscrews (4), and two new self-locking nuts (146). Torque self-locking
nuts to 30-35 lb-ft (41-48 Nm).
3-29
|
||