E. ELECTRICAL INSTALLATION TO CIRCUIT BREAKER BOX
1. Open the circuit breaker box (12) and install a new 20 amp circuit breaker, P/N 12368614 (24), in an open
slot.
2. Strip the insulation from the end of the three wires (15), (16), and (17) and install three terminal lugs P/N
853145 (25), to the ends of the three wires (15), (16), and (17).
3. Inside the circuit breaker box (12), connect the black wire (15) to the 20 amp circuit breaker (24). Connect
the white wire (17) to the neutral bus (26), and connect the green wire (16) to the ground bus (27).
4. Close the cover on the circuit breaker box (12).
26
12
15, 16, 17
24
25
27
F. 110-VOLT INSTALLATION TEST
1. Connect 110-volt power to the semitrailer and using a multimeter, test each connector receptacle for 110-
volt power.
2. If 110-volt power is not available at the connector receptacles, troubleshoot 110-volt power system.
J-7 (J-8 Blank)



 