Custom Search
 
  
 


TM 9-2330-331-14&P
0055 00
BULKHEAD AND STOWAGE RACK ASSEMBLY REPLACEMENT - Continued
INSTALLATION
WARNING
Bulkhead assembly weighs 250 lbs. (113.4 kg). Failure to secure
bulkhead during replacement may cause serious injury or death.
1. Place bulkhead (1) on trailer deck.
2. Carefully place bulkhead (1) in position.
3. Secure bulkhead (1) using four new bolts (2), eight washers (3), and four new locknuts (4).
4. Install two new bolts (7), washers (6), and new locknuts (5). Torque per WP 0088 00-2.
NOTE
During snow or freezing conditions, cover bulkhead stowage area with a tarp
and secure with bungee cords. This will help prevent the stored components
from freezing together.
1
2
3
3
4
7
5
6
Figure 1. Bulkhead and Stowage Rack
FOLLOW-ON TASKS
Replace side boards and stakes if removed (WP 0007 00-5).
END OF WORK PACKAGE
0055 00-2



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business