Custom Search
 
  
 


TM 9-2330-329-14&P
ENGINE AND PUMP CABINET FRAME REPLACEMENT--Continued
0142 00
INSTALLATION
NOTE
Engine frame is bolted together. Loosely assemble frame
components on a flat surface. Tighten fasteners on cross
members last.
1.
Install engine and pump to frame.
2.
Using a forklift, maneuver engine cabinet in place at semitrailer.
3.
Install front inside vertical support (87), two bolts (90), four washers (89), and two new self-locking
nuts (88) to semitrailer tank rib (83).
4.
Install front inside vertical support (87) with four bolts (86), eight washers (85), and four new self-
locking nuts (84).
5.
Install angle bracket (79), three bolts (80), six washers (81), and three new self-locking nuts (82) to
engine frame (61).
0142 00-10



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business