Custom Search
 
  
 


TM 9-2330-329-14&P
ROADSIDE LANDING LEG AND HANDCRANK REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Jack stands (item 3, WP 0156 00)
Materials/Parts
Lifting device (item 1, WP 0156 00)
Self-locking nuts (4) (item 97, WP 0160 00)
Personnel Required
Self-locking nut (8) (item 132, WP 0160 00)
Two
References
Equipment Conditions
Semitrailer grounded (refer to WP 0007 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
REMOVAL
NOTE
Landing gear legs should be raised 6 inches (15.2 cm)
off the ground prior to performing this procedure.
Semitrailer must be on jack stands or connected to a
prime mover prior to performing this procedure.
1.
Remove nut (2), two washers (3), bolt (4), and handcrank (5) from shaft (1).
0082 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business