Custom Search
 
  
 


TM 9-2330-329-14&P
OPERATION UNDER USUAL CONDITIONS--Continued
0007 00
4.
SELF-LOADING OPERATIONS
CAUTION
Remove vent cap from either side of vapor recovery
tube to vent tank during pumping operations.
NOTE
Operations begin and end with all valves closed.
a.
Remove fire extinguishers (1) and bring them to the point of operation.
b.
Ground semitrailer per WP 0007 00-5 above.
c.
Remove one or both vapor recovery system caps.
d.
Start engine (WP 0007 00-7). When engine is warm, adjust to idle speed (10001200 rpm).
e.
Remove 4-in. hose (2) from hose tube (3) and connect hose (2) between outlet B (7) and fuel
storage facility.
f.
Open valves A, B, D, E, and G (9, 6, 8, 4, and 5).
g.
Adjust engine to desired flow rate (290320 gpm [10981211 Lpm] @ 22002400 rpm).
0007 00-19



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business