Custom Search
 
  
 


TM 9-2330-326-14&P
6-21. TIEDOWN RINGS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Oil, lubricating (Item 9, Appendix F)
Equipment Conditions:
References:
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
Ground boards emplaced
CAUTION
Replace damaged/deformed D-Rings.
NOTE
There are 4 ammunition and 36 cargo tiedown rings and they
are removed and installed the same way. This procedure covers
one tiedown ring.
See Paragraph 6-1 for additional service requirements.
General Procedure:
a.
Removal.
Remove cotter key, nut, bolt, sleeve, upper ring, and lower ring.
b. Installation.
NOTE
Hand tighten nut against D-ring. Make sure D-ring does not bind.
Install lower ring into deck pinning, upper ring, sleeve, bolt, nut, and cotter key.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business