Operation Under Usual Conditions (Cont)
2-129. POST OPERATION PROCEDURES (CONT).
2
2 640P
4
3
i. After pump is completely drained, replace four discharge caps (2),
main inlet cap (3), and passenger side auxiliary inlet cap (4).
j.  If required, follow SOP and fill out pump run log, indicating total
pumping time and out-of-station time.
k. Report all pump, truck equipment malfunctions, and irregularities to
your supervisor.