Custom Search
 
  
 


TM 10-6640-215-13 5-10.  REMOVE/INSTALL CONTROL DEVICES (WATER SYSTEM). This task consists of: a.  Removal b.  Installation INITIAL SET-UP: Tools required General Mechanics Tool Kit, (Appendix B, Section III, Item 2) Material Required Teflon Tape, (Appendix E, Section II, Item 157) Reference TB-SIG-222, Soldering Methods and Equipment Equipment Condition Water pump turned off. Water pressure relieved by opening sink faucet. REMOVAL Remove Water System Control Devices.  See figure 5-6. a. Remove threaded stopcock valves by unscrewing valves from tees or elbows located in water system piping. b.   To remove soldered/brazed valves or flow control devices, proceed as follows: (1) Disconnect pipe union(s) closest to control device to being removed. (2) Remove pipe section with control device attached. (3) Unsolder/unbraze control device from piping. INSTALLATION Install Water System Control Devices.  See figure 5-6. a. Apply teflon tape to male fittings.  Be sure to wrap tape in same direction as pipe thread. b. Install threaded stopcock valves into tees or elbows located in system piping. c. To install soldered/brazed valves or flow control devices, proceed as follows: (1) Solder braze control device to piping. (2) Install pipe section with control device attached (3) Connect pipe unions. d. Prepare and operate water system using internal water tank as source in accordance with procedures listed in paragraph 2-8. e. Inspect for leaks and check for proper operation. 5-10


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business